WARDS ISLAND WASTER WATER TREATMENT PLANT CASE -Materials
under construction
89807 =2-17-2024.jpg The aftermath of digester spill (Digester 5)
2-19-2024 (3).MOV Excess gas from Digester 5 opened safety valve and released sludge
1-8-2024 (1).MOV Blue circle on flashing is a direct drain to river. No covering on drain sludge from Burp to go directly into the River
89805 =2-17-2024 The aftermath of digester spill (Digester 5)89805 =2-17-2024 The aftermath of digester spill (Digester 5)
2-19-24 (3).MOV Digester 5 overflow sludge residue from burp into trough. Filled up both sides. And down to the street. Right to that drain that leads to river.
4-28-2024 Spill from Digester 3 Spill Box went into blue drain which leads straight to the river.
3-28-2023 “Burping” from sludge digester emits pollutants straight into drains into the river.